Cash Cycle
Additional Information
The Cash Cycle visualizer allows you to view a list of cash cycle actuals and goals for a project. The project is selected from the Project Scorecard at the top of the tab.
The chart is organized by number of days and posting periods and display the Unbilled Days, Receivable Days, Cash Cycle Days, and Days to Bill values for each posting period.
Chart Data
| Area | Description |
|---|---|
| Number of Days | The left-side of the chart, or the y-axis, displays number of days. |
| Period | The area below the chart, or x-axis, displays the last six posting periods, based on the current date. The posting periods are based on the selected Posting Calendar for the project. |
| Chart | The chart includes the following information. Goal lines are dotted and display in the same color as the actuals line.
|